Marshal Missouri
Southeast Substation
|
Class aptent taciti sociosqu ad litora torquent per conubia nostra, per inceptos himenaeos. Nam nec ante. Sed lacinia, urna non tincidunt mattis, tortor neque adipiscing diam, a cursus ipsum ante quis turpis. Nulla facilisi. Ut fringilla. Suspendisse potenti. Nunc feugiat mi a tellus consequat imperdiet. Vestibulum sapien. Proin quam. Etiam ultrices. Suspendisse in justo eu magna luctus suscipit.
|
Kansas State University
New Chiller Plant 2 & Chilled Water System Improvements
New Chiller Plant 2 & Chilled Water System Improvements
|
LDB served on the design team that upgraded the existing chilled water system at KSU. A new chilled water plant (CP2) was installed to increase chilled water capacity. Analysis software was utilized to develop a hydraulic model of the existing distribution system to size improvement to the distribution system. The new chilled water plant added two new 2925 ton chillers with provisions for future expansion of an additional three chillers. New, expandable cooling towers were also incorporated into the project. In addition to the new plant, the project replaced an existing 1250 ton absorption chiller in the existing chiller plant (CP1) and replaced it with a new 1250 ton electric VFD driven chiller.
|
Falls City Nebraska - Power Plant Addition
|
LDB prepared a power supply study followed by a feasibility study for Falls City, Nebraska. Design of a dual fuel diesel generating unit to replace aging electric generating capacity of the City’s electrical system has been recently completed.
|
|